Installation Date: February 29, 2025
Project Location: Alaska, United States
Products Used: 2× GSL ENERGY 14.24kWh IP65 Wall-Mounted Energy Storage Batteries + Megarevo Inverter
To effectively address the challenges posed by Alaska's harsh winter conditions and frequent power outages, GSL ENERGY successfully deployed a 28 kWh wall-mounted outdoor energy storage system on the exterior wall of a high-end villa on February 29, 2025. The system was complemented by a high-compatibility Megarevo inverter, enabling seamless integration of residential solar power generation and energy storage.
This project utilized two 14.24 kWh IP65-rated wall-mounted lithium iron phosphate batteries, featuring exceptional waterproof and dustproof performance, capable of stable operation in extreme cold and high humidity conditions. The battery system was securely installed on the villa's exterior wall, effectively saving indoor space while ensuring the safety and long-term reliability of outdoor operation.
Based on feedback from the site, customers have highly praised the aesthetic design, structural craftsmanship, and actual performance of the GSL wall-mounted batteries. During the acceptance process, customers expressed full trust and satisfaction with the system's performance with a smile.
This project not only validated the reliability and weather resistance of GSL ENERGY's energy storage products in high-latitude, low-temperature environments but also provided a mature example for residential photovoltaic storage solutions in cold regions. In the future, GSL ENERGY will continue to provide high-quality battery systems and professional technical support to build a green, safe, and reliable smart energy ecosystem for global users.